Project on Irrigation Scheme Development in Central and Eastern Uganda (PISD)

Project on Irrigation Scheme Development in Central and Eastern Uganda (PISD)

The Ministry of Agriculture, Animal Industry, and Fisheries (MAAIF) and Japan International Cooperation Agency (JICA) agreed to execute a study for Irrigation Scheme Development referred to as The Project on Irrigation Scheme Development in Central and Eastern Uganda (PISD) through technical cooperation.

The focus was on establishment of medium and large scale irrigation scheme in Uganda targeting farmers cultivating mainly rice in lowland areas with season flooding and unreliable agricultural water source(s). The Study has was entrusted by JICA to the JICA Study Team consists of a consultant from Japan in collaboration with counterpart staffs from MAAIF and MWE. A total of 10 candidate sites districts were studied for irrigation development potential in the districts of Butambala, Buikwe, Kween, Sironko, Bukedea, Bulambuli, Mbale, Butaleja, Budaka and Soroti.

In the first phase, the Study Team conducted potential site identification study on all the candidate sites. An Irrigation Scheme Development Plan was formulated for each site which included an Estimated Brief Project cost, and Project evaluation. The first phase also prioritized three potential sites for further study namely Namatala Swamp (Mbale, Budaka and Butaleja Districts), Sironko-Acomai Wetland and Atari River wetlands (Bukedea, Bulambuli and Kween districts). Among the three sites, detailed feasibility study was conducted only for the Sironko-Acomai and Atari wetland systems, while pre-feasibility level study and Irrigation Management Plan was conducted for Namatala Swamp(Mabale, Butaleja and Budaka).

Objectives of the Project
The main purpose of the project is contributing to improvement of livelihood of farmers cultivating rice in the lowland (wetland) areas of the country through the development of sustainable irrigated agriculture for the rice production taking into account the wise use of wetlands.

The project’s development objective is to draw up a road map to increase the beneficial area under sustainable irrigation in Central and Eastern Uganda.

Focus Areas of The PISD-Irrigation Development Plan
The project is focusing on the following components in drawing up a comprehensive development plan for rice irrigation in Eastern Uganda;
• Enhancement of rice production
• Improved land use for lowland and upland areas
• Water resources management with irrigation in the big picture
• Establishment of buffer zones in the target wetland systems
• Development planning for Irrigation and agriculture infrastructure
• Organizing and training of farmers on O&M aspects of the planned irrigation systems

 On-going Project Activities
The following aspects are some of the major project activities currently being undertaken during studies by the project team;
• Community mobilization and sensitization
• Farm household/ topographic/environmental surveys
• Preparation of designs for the facilities
• Estimation of project costs and benefits
• Planning for the operation and maintenance
• Establishing farm plans and schedules
• Formulating plans for establishing/strengthening WUAs
• Planning community based wetland management

 Achievements of the PISD –Project to date
The implementation of PISD project commenced in May 2014 with the initial pre-feasibility studies to identify the potential sites for irrigation development in Eastern and Central Uganda. The following progress has been registered so far;
1) Ten potential candidate sites were identified during phase 1 (May 2014-March 2015) and Irrigation development plans drawn up for the sites; highlighting the investment portfolio and economic returns accruing from each enlisted sites below;

  • Atari Irrigation scheme-680Ha (Kween and Bulambuli Districts)
  • Acomai Irrigation site -1000Ha (Bukedea and Bulambuli Districts)
  • Namatala Wetland System-3000Ha (Budaka, Mbale, Butaleja Districts)
  • Omirio Irrigation site-250Ha (Soroti District)
  • Ngenge Site-900Ha (Kween District)
  • Bulo Wetland-90Ha (Butambala District)
  • Lwoba, Bwirya, Doho- Muhula-1000Ha (Butaleja District)
  • Upper Namatala site (Mbale District)
  • Sipi Site-800Ha (Sironko District)
  • Buikwe Site 150Ha (Buikwe District)

2. Complete feasilbility studies for two proposed schemes (Atari in Bulambuli/Kween Districts) and (Acomai in Bukedea/Bulambuli Districts) were carried out with support from JICA.

3. Complete Environment Impact Assessments were carried out for the two proposed schemes (Atari in Bulambuli/Kween Districts and Sironko in Bukedea/Bulambuli Districts)

4. A Resettlement Action Plan (RAP) study is ongoing for the Atari Irrigation scheme

5. Construction of Atari Irrigation Scheme is expected to begin next financial year with joint funding from the Government of Uganda and the Government of Japan (GRANT AID).

6. A detailed long term development plan for the Namatala wetland system covering the Districts of Butaleja, Budaka and Mbale is also being crafted and will focus on institutional development of farmer groups and water user association in preparation for future infrastructure development.

7. A number of gauging stations and hydro-metrological stations have been established in the target catchments to collect meteorological data for project use.

8. Capacities of MAAIF/MWE and District local government staff on irrigation scheme planning and design is being continually enriched.

9. Detailed design for the Sironko-Acomai Irrigation Scheme is underway.

The Certificate of Approval of Environmental Impact Assessment for the Atari River Basin Irrigation Scheme is downloadable here.

The Environmental and Social Impact Assessment (ESIA) Report is also downloadable here.